The EDCs have completed the final update to their rate design methodology. This update results in the following EDC-specific seasonal factors, which are final:
EDC
|
Summer Factor
|
Winter Factor
|
PSE&G
|
1.0000
|
1.0000
|
JCP&L
|
1.0000
|
1.0000
|
ACE
|
1.0000
|
1.0000
|
RECO
|
1.0000
|
1.0000
|
When both the summer and winter factors are set to 1.0000, BGS-RSCP suppliers are paid the Auction price for that EDC for every kWh of load served in all months of the three-year supply period.
The BGS Auction Manager has posted the final BGS-RSCP Rate Spreadsheets and the Rate Spreadsheet Tool to the additional data page of the BGS Auction Data Room.
January 30, 2025.
|