Each product in the Auction is divided into units called tranches, each representing the same percentage of that EDC’s BGS-RSCP load in this Auction. The MW-measure of each tranche is determined on the basis of the obligation attributable to all RSCP customers (those who receive BGS and those who do not) during 2025 (called the RSCP Peak Load Share). The EDCs do not represent that each tranche will have loads of a particular value. The actual BGS-RSCP Load will depend upon many factors including customer migration to third party suppliers and weather conditions. Bidders are responsible for evaluating the uncertainties associated with BGS-RSCP Load.
1/13/2026, in General.
|