BGS Auction brandmark
Search:
 
ANNOUNCEMENT: Final Seasonal Factors; POSTING: Updated BGS-RSCP Rate Spreadsheets and Rate Spreadsheet Tool

The EDCs have completed the final update to their rate design methodology. This update results in the following EDC-specific seasonal factors, which are final:

EDC

Summer Factor

Winter Factor

PSE&G

1.0000

1.0000

JCP&L

1.0000

1.0000

ACE

1.0000

1.0000

RECO

1.0000

1.0000

 

 

 

 

 

 

 

 

When both the summer and winter factors are set to 1.0000, BGS-RSCP suppliers are paid the Auction price for that EDC for every kWh of load served in all months of the three-year supply period.

The BGS Auction Manager has posted the final BGS-RSCP Rate Spreadsheets and the Rate Spreadsheet Tool to the additional data page of the BGS Auction Data Room.

January 26, 2023.

<< Back to Home


What's New